West Calgary Ring Road



1. What are the project hours?

  • The project hours for construction of the Southwest Calgary Ring Road (SWCRR) are Monday to Saturday from 7:00 a.m. to 10:00 p.m. and Sundays and holidays from 9:00 a.m. to 10:00 p.m.
  • The hours for the north gravel site and haul road are Monday to Saturday from 8:00 a.m. to 8:00 p.m. and Sundays and holidays from 9:00 a.m. to 8:00 p.m.
  • Select activities may occur outside of these hours with special permission from Alberta Transportation.
  • There are other third-party contractors carrying out construction in the Transportation Utility Corridor (TUC) that may work under different hours.

2. What are the construction noise restrictions?

  • Construction activities are subject to a noise level restriction set by the Province of an average 65 decibels over a 24-hour period.

3. Who do I contact if I have a noise concern?

4. What are the noise level restrictions for the SWCRR?

  • The SWCRR is located within the Province’s TUC and is subject to provincial noise attenuation guidelines.
  • Alberta Transportation has adopted a noise level of 65 decibels over a 24-hour period (A-weighted) measured 1.2 metres above ground level and 2 metres inside the property line (outside the highway right-of-way).
  • Additional resource:

5. Are the Province’s noise level restrictions the same as the City of Calgary’s?

  • No, the provincial guidelines for noise attenuation in urban areas are different than those used by the City of Calgary; however, they are consistent with the policies used by the City of Edmonton and other urban areas.
  • The provincial guidelines have been used to determine the need for noise mitigation measures along the ring roads in Edmonton and Calgary.
  • The guidelines are regularly reviewed to ensure they remain applicable.

6. Will there be noise mitigation along the SWCRR (e.g., a berm or wall)?

  • The construction of any noise mitigation measures is determined by the Province’s guidelines, which require that road noise be addressed if it reaches higher than 65 decibels averaged over a 24-hour period.
  • KGL undertook a noise modelling study to determine where measures may be required along the project corridor to meet these guidelines.
  • If the noise is expected to be above this threshold, then KGL is required to construct a barrier.
  • Once the roadway is open, Alberta Transportation will be doing a noise monitoring study to confirm that noise levels are not exceeding the Provincial guidelines.
  • During the operating period (30 years) Mountain View Partners will monitor noise levels and provide additional mitigation if the threshold is exceeded.




1. How is dust controlled?

  • Dust at all work sites will be monitored regularly during SWCRR construction.
  • Mitigation measures include watering, application of dust palliatives, use of seeding tackifiers, and other site-specific measures.

2. Who do I contact if I have a dust concern?



1. How do I report outages or suggest changes to traffic signals in the project corridor?

2. Why are the speed limits so low along the project corridor?

  • The speed limits in construction zones are set for the safety of workers and the travelling public:
    • There may be workers or equipment in close proximity to the road.
    • There may be construction activity, road conditions (e.g., excavations, material, or clear zones) or alignment changes that have changed or not apparent to the travelling public.
    • There may be equipment entering and existing roads.

3. How is KGL minimizing debris tracked onto public roads?

  • Gravel strips or cattle guards are placed at access points to construction sites to remove mud from haul truck tires.
  • Haul trucks are swept before leaving sites to ensure they are clear of gravel.
  • KGL works with subcontractors to ensure that they adhere to all applicable regulations for hauling, including use of truck bed coverings.
  • A regular street sweeping program has been initiated on roads within the TUC.
  • KGL has retained the services of a 24/7 road maintenance company that performs spot cleanings on roads as needed.

4. How can I report debris on the road?

5. How do you determine the location of haul roads along the project corridor?

  • Haul routes are determined by project needs, access throughout the construction site and safety considerations to remove truck traffic and equipment from public roads.
  • In some cases, traffic signals may be installed along major roads in order to allow haul trucks to safely enter and exit site access points.
  • Truck and equipment operators are provided with route maps to avoid residential neighbourhoods and congested areas.


Traffic Impacts

1. Where can I find a list of traffic impacts for the upcoming construction season?

2. Will access on 37 Street to and from Glenmore Trail be closed during construction?

  • No, access on 37 Street to and from Glenmore Trail will remain open during the construction period
  • A series of ramp realignments are planned for this area in order to maintain connectivity

3. Will the construction of the 37 Street interchange change traffic patterns in Lakeview?

  • KGL is building the 37 Street interchange according to the contracted design provided by Alberta Transportation
  • This, in turn, is based on the agreement between the province and the Tsuut’ina Nation
  • If residents have concerns about future traffic impacts, they are encouraged to contact the City of Calgary to discuss potential traffic calming methods

4. Why are you closing 37 Street at Highway 22X?

  • 37 Street is scheduled to close in the summer of 2018 to ensure the safety of the travelling public
  • This is due to the realignment of westbound traffic into the current median of Highway 22X, which will remove a safe traffic queuing distance from the median
  • Around the same time, KGL will start upgrading the existing westbound lanes, which will further restrict access
  • Alternative routes are available on 53 Street S.W. or James McKevitt Road

5. Why does the new interchange at 6 Street / Sheriff King Street only provide limited access to Highway 22X?

  • Sheriff King Street is in close proximity to the other major interchanges of Macloed Trail and James McKevitt Road, which are intended for high speed, high traffic operations
  • If Sheriff King Street did have additional access, it would result in traffic merging and exiting in very close proximity (compromised weave distances)
  • This could result in a safety hazard or traffic bottleneck, similar to what sometimes occurs on Calgary’s existing roads
  • 194 Avenue is being constructed by the City of Calgary to provide alternative access from Silverado to Tournament Lane and to Macleod Trail

6. Why does the new interchange at 130 Avenue only provide limited access to the SWCRR?

  • 130 Avenue is in close proximity to the major interchange at Anderson Road, which is considered a systems interchange and intended for high speed, high traffic operations
  • If 130 Avenue did have additional access, it would result in traffic merging and exiting in very close proximity (compromised weave distances)
  • This could result in a safety hazard or traffic bottleneck, similar to what sometimes occurs on Calgary’s existing roads
  • Drivers have additional access to the Anderson Road interchange via Buffalo Run Boulevard


Light Pollution

1. What is being done to limit light pollution from the SWCRR?

  • There are a number of changes to lighting along the SWCRR, compared to other portions of the ring road
  • Energy efficient LED luminaries are being used to reduce power consumption while maintaining required lighting levels (rather than high pressure sodium lights)
  • Several different types of luminaries were reviewed and compared during the evaluation process
  • The overall lighting approach for the SWCRR is to direct light downward on the roadway to avoid misdirection (light that radiates off to the sides and upward)
  • Mitigation measures to reduce light trespass, pollution and glare include:
    • Using energy efficient LED luminaries, which allow light to be placed accurately on the roadway
    • Using luminaries that don’t emit any light directly to the sky
    • Mounting luminaries on shorter light stands
    • Reducing lighting to minimum levels, while maintaining the safe operation of the SWCRR
    • Using retroreflective sign sheeting, so there aren’t any upward facing lights on directional signs

2018-02-28 11_38_46-Info Sessions_Lighting_Final_Feb2018 - Bluebeam Revu x64


West Calgary Ring Road

1. What is the West Calgary Ring Road?

  • The West Calgary Ring Road is the final portion of Calgary’s ring road that runs from Highway 8 at 101 Street to Highway 1 at Stoney Trail.

2. What is the timeline for construction of the West Calgary Ring Road?

  • A timeline and delivery method has not been announced by the Province.
  • This project is not currently in the Province’s Three-Year Construction Program; however, it is in the Four Year Capital Plan.